Construction of Inlet and Outfall Marine Pipeline for SAKO Desalination Plant


In Mar. 2016 SAFF was awarded the Construction of Inlet and Outfall Marine Pipeline for SAKO Desalination Plant and the contract was signed between SAFF and Asia Water Engineering Co. in April 2016. The project duration is 24 months and it includes the following scope of work:


   1- Dredging: 1.1 million m3
   2- Excavation: 0.18 million m3
   3- Fabrication: Welding of pipe strings (17 km)
   4- Installation: 6 inlet (and the chlorination pipes) and 3 outfall 2.5m pipes (maximum length 2.2 km) 
   5- Bedding: 0.12 million m3
   6- Offshore Backfilling: 0.39 million m3
   7- Onshore Backfilling: 0.13 million m3

 Project Summary
 Location  Bandar Abbas
 Client  Asia Water Engineering Company
 Duration  24 months
 Value (ME)  42.5
 Start Date  Apr. 2016 (On Going)
 Scope

 Dredging : 1.1 million m3

 Excavation : 0.18 million m3

 Fabrication : Welding of pipe strings (17 km)

 Installation : 6 inlet (and chlorination pipes) and 3 outfall 2.5m pipes (maximum length 2.2 km)

 Bedding : 0.12 million m3

 Offshore Backfilling : 0.39 million m3

 Onshore Backfilling : 0.13 million m3

 