Construction of a new manifold for East Marun 3 Production Facility

marun3

                                                                                                                                                                                               

                                                                                                                                                                                               Decorative Photo

  

 SAFF has just been awarded the project to construct a new manifold for East Marun 3 Production Facility which is located 60km from Ahwaz towards the west. The client is NISOC and the project duration is 23 months. This will be SAFF’s first onshore PCC project which can be considered as an important milestone. The scope of work for this project includes: 

  • Civil works (leveling of the site 120 x 105 m, fabrication of supports, fabrication steel walkways, construction of concrete culverts, construction of electrical room, construction of foundation, construction of a 210 m2 office for the client, construction of access roads, construction of a covered parking, construction of a guard room, construction of two bridges, painting, etc)
  • Mechanical works (fabrication and installation of new manifold with 42 inlet lines, fabrication and installation of 10 dividers, separation of 24 wells and connecting them to the new manifold, fabrication and installation of 9 outlet headers, fabrication and installation of firefighting system, installation of sampler and adding 4 lines in the existing southern manifold, installation of 3 ton overhead crane, installation of 2 air compressors, and blasting and painting, removal of old pipelines, testing, commissioning, etc).
  • Electrical works (cabling, installation of lighting system, installation of telephone system, installation of earthing system, etc)
  • Instrumentation works (installation of transmitters, installation of indicators, installation electrical valves, installation of control room control system, etc)
  • Procurement works (for all mechanical items, electrical items, instrumentation items, and part of civil materials)

 

  Project Summary
 Location  Ahvaz
 Client  National Iranian South Oil Company
 Duration  23 months
Value (MIRR)   200,000
 Start Date  Apr. 2017 (On Going)
 Scope  East of Maroon No. 3 New Manifold Project as an EPC Package
 marun960809 2p2 marun960809 1   marun960809 3

South Pars Phase 19 Shore Protection

South Pars Phase 19 Shore Protection

This project consisted of EPC package for Shore Protection in south pars Gas field phase 19 that was signed between SAFF and POGC in Jun. 2015.The scope included execution of surplus layer and different stone layers including Core, Mattress, Filter and Armor.The project has been divided to two phases according to client priorities.

 

Project Summary
 Location  South Pars Phase 19
 Client  POGC
 Duration  8 months
 Start Date  Jun. 2015
 Scope  EPC package for Phase 19 Shore Protection
ph191 ph192
 ph193  ph194

 

Civil, Mechanical & Pipeline Works, Area A, B & C Phase 14

Civil, Mechanical & Pipeline Works, Area A, B & C Phase 14

This project consisted of PC and pre-commissioning package for Piping, civil and Mechanical works of onshore facilities for phase for 14 and it was signed between SAFF and IDRO/IPMI in Nov. 2012. The project scope included 300,000 ID of piping, 6000 m3 of concrete, installation of 1000 ton of rotary and fixed equipment and 500 tons of pipe support.

 Project Summary
 Location  South Pars phase 14 - Kangan
 Client  IDRO/IPMI
 Duration  18 months
 Start Date  Nov. 2012
 Scope

 PC package and pre-commissioning for :

  •  Piping
  • Civil
  • Mechanical
  • Refinery Pipe Rack
 ph141 ph142
 ph143  ph144
  ph145

 

South Pars Phase 19 Sea Water Intake

South Pars Phase 19 Sea Water Intake

Scope of this project was the EPCC package for 20,000 m3/hr sea water intake in south pars Gas field phase 19 and civil site work in sea water intake area awarded to SAFF on 4th of Jul 2011 by POGC. The concrete volume for this project was 7000 m3 and the reinforcement weight was 850 T. The scope also included 10x2 ton Gantry Crane, two primary screens, two secondary screens, five stop legs and other relevant facilities. This project was delivered in Mar. 2015.

 

Project Summary
  Location    South Pars Phase 19
  Client   POGC-Petro Pars Iran
  Duration   16 months
  Start Date   Jul. 2011
  Completion Date   Mar. 2013
  Scope    EPCC package for 20,000 m3/hour sea water intake in south pars Gas phase 19 and civil site work in sea  water Intake area

 

sp19p1 sp19p2
sp19p3 4
sp19p5  6
 PA150039  P2080015

 

 

 

 

Shore Protection

sp1

 

PROJECT                                     EPC Contract for Shore Protection

LOCATION                                   South Pars Gas Field Phase 19-kangan

CLIENT                                        POGC-Petro Pars Iran

CONTRACTOR                            SAFF Co.

START DATE                               June / 2015

DURATION                                  8 months

PROJECT DESCRIPTION

 

Management, Engineering, Procurement, and Construction of Shore Protection in south pars Gas field phase 19.The project consists of execution of surplus layer and different stone layers including Core, Mattress, Filter and Armor.The project has been divided to two phases according to client priorities.

PROJECT CURRENT STATUS

First phase of the project has been completed and hand over to client in provision acceptance stage.

 